From April 4th, 2026 to May 8th, 2026, there are two Chinese holidays. If you have any questions, please contact with us by mobile phone or email. Thank you !

·Sep 2025, ArenaPetro Launches New 38mm MCM300 Telemetry System
·Feb 2025, ArenaPetro released new high-precision natural gamma ray spectrometry logging tool PSGR model B
·Jan 2025, ArenaPetro released AXP800AE wireline logging surface panel
·Nov 2024, ArenaPetro released MCM1500 high speed telemetry system
·July 2024, ArenaPetro released new generation Well Integrity Inspection System
·Feb 2024, released the AXP600HE/HC wireline logging surface panel
·Oct 2023, ArenaPetro released new MCM1200 high speed telemetry system
·April 2023, ArenaPetro released new MCM series high speed telemetry system
·Jan 2023, ArenaPetro released the DINT Gyro logging tool.
·Jan.2023, ArenaPetro released EURO Tool
·Feb 1st, 2018, ArenaPetro released AXP acquisition software version 1.95
·Jun 6th,2016, ArenaPetro released the AXP600GE/GC surface system
·August 11, start mass production of AXP600FC surface panel
·August 8, 2014, Released AXP acquisition software V1.80
页次:1/1  每页20  共14条  分页:[1